img
White City, 7°C
Time Logo
  • Sign up
  • Subscription
0
  • Newest
  • Politics
  • Economy
  • Society
  • The World
  • 2026 Elections
  • Culture
  • Mozaik
  • Comment
  • Printed edition
  • Archive
  • Newsletter
  • Podcast
  • Newest
  • Politics
  • Economy
  • Society
  • The World
  • 2026 Elections
  • Culture
  • Mozaik
  • Comment
  • Printed edition
  • Archive
  • Newsletter
  • Podcast

Latest Edition

Add to cart

Beograd

Now it is obvious that "Millenium" is demolishing the "Yugoslavia" hotel

April 15, 2024, 17:47 am S.Ć.
Photo: Promo
Instead of the hotel "Yugoslavia"
Copied

According to the draft plan, which is available for public inspection as of today, it is clear that the "Yugoslavia" hotel will be demolished, that there will be two towers, and that none of this is in accordance with the higher order plan. Public inspection of the proposed Draft is the only legal possibility to challenge these illegalities

Today, the public review of the Draft Detailed Regulation Plan (DRP) of block 11 and part of block 10 in the municipalities of Novi Beograd and Zemun began, that is, for the area on the banks of the Danube, where it is now located Hotel "Yugoslavia". Public inspection lasts until May 20.

The creation of a new detailed regulation plan is financed by Millennium Team's daughter company PD MV Investment doo.

This March, the "Yugoslavia" hotel was sold to the "Millennium Team" for 27 million euros.

Demolition is allowed.

According to the still valid Detailed Regulation Plan, the reconstruction of Hotel "Yugoslavia" is foreseen, and in the PDR, which is available for public inspection as of today, it is stated that "removal of all existing buildings within the urban zone M4 is permitted". According to the "Naša mesna zajednica" association, this means that the "Yugoslavia" hotel, built 55 years ago, will be demolished.

"This is unequivocally seen from the graphic part of the plan as well as the textual part of the study analysis in which it is explicitly stated that the demolition of Hotel Jugoslavija is planned," the association says.

Instead of the "Yugoslavia" hotel, PDR envisages the construction of a luxury hotel and two towers, one of which should be a business and the other residential. The towers are 255 meters high, and the building is 48 meters high.

The Association claims that the new PDR "is in complete collision with the higher order plan - the General Regulation Plan of Belgrade".

Pretending to be green

The most obvious argument for this claim is the maximum permitted height of buildings: For residential and commercial buildings, the maximum permitted height of the building is 48 meters, not 155 meters as stipulated in the new PDR.

Then: According to the general regulation plan of Belgrade, the area where Hotel Jugoslavija is located is intended for commercial facilities, not for a residential-business complex.

Next: The general regulation plan of Belgrade. The minimum percentage of green and free areas on the plot on which a residential and business facility is planned is 40%, while, according to the association, the new detailed regulation plan envisages less than 10% of green areas. They point out that the required percentage of free and green areas is faked "by taking into account the existing green area of ​​the Liberation Quay with the planned purpose of the green area on the banks of the Danube and the part of the Danube with the planned purpose of the water area."

On that 10 percent of the green area, it is planned to build a measuring and regulating gas station with a protective belt, which will further reduce green areas.

It is also planned to relocate the existing sewage collector without the previously prepared project documentation for its relocation, as requested by the Belgrade Public Water and Sewerage PUC. The preparation of the documentation is foreseen after the adoption of the plan, so there is a high probability that the existing already overloaded sewage infrastructure will be endangered.

One kindergarten per 1150 inhabitants

According to the new PDR, 1150 new residents and 1600 employees will live in the mentioned two blocks, and a kindergarten is planned for only 80 children, which will not be nearly enough. Instead of providing a kindergarten of the necessary capacity with a yard where children can play, it is planned that the tenants will use five existing preschool institutions located in the immediate vicinity of Hotel "Yugoslavia". Needless to say, they are all already full.

Public inspection of this PDR is open until May 20, every working day from 9 a.m. to 18 p.m., in the building of the City Administration of the City of Belgrade, at Street 27 Marta 43-45. The public session of the Planning Commission of the Belgrade City Assembly will be held on June 13. During the public session, all natural and legal persons present who have submitted objections in relation to the Plan Draft in written form may explain their objections to the Committee for Plans of the Belgrade City Assembly.

Public review is the only legal possibility to challenge the proposed draft.

 

Tags:

Demolition Hotel Yugoslavia The Millennium Team PDR public inspection
Copied

In between

What is happening in the country and the world, what is in the newspapers and how to pass the time?
Every Wednesday at noon In between arrives by email. It's a pretty solid newsletter, so sign up!

More from the section Society
Residential building, illustration

News

23.October 2026 B. B.

Real estate identity card freely available on the Internet

"Identity card of your real estate" has the same legal force as the document issued at the counter and is valid before all competent institutions

Aleksandar Vučić was a guest on the Albatros news podcast

Podcast

22.October 2026 Almire Pichon

Vučić on bot attacks: "Time doesn't mean anything to me"

Aleksandar Vučić commented on bot attacks on social networks and the case of an attack on the account of the weekly "Vreme" in the Albatros news podcast. And lied

Student Andrej Premović from Raška, whose house was overrun

Student

22.October 2026 Almire Pichon

Who is Andrej Premović, the "golden" student from Raška who is suspected of exposing the SNS bots

Andrej Premović, a student at the Faculty of Computing from Raška, had his house searched by the police because of the website ocisti.net, which records more than 32.000 accounts of alleged SNS bots. Who is the young man who is suspected of exposing the illegal activities of the progressives

Mrdić's laws

News

22.October 2026 M.T.

KRIK: How Uglješa Mrdić bought two apartments in Belgrade in 45 days

KRIK reveals that SNS official Uglješa Mrdić bought two apartments with a total value of around 170.000 euros in the middle of the year. Previously, he did not own any real estate. He did not take out a loan

News

22.October 2026 M.T.

CINS: Errors in the construction of buildings within the Expo in Surčin could have endangered lives

CINS announced that in the construction of the residential complex for Expo 2027 in Surčin, failures were observed which, according to experts, could have led to a collapse. The building directorate claims that the changes were approved by an independent inspection and the construction professors claim that the slab is still unsafe

Comment
Billboards in the pre-election campaign of Aleksandar Vučić

Comment

Vučić's billboards and reality

There is, literally, no difference between the one who claims it is day in the middle of the night, or the one who claims to be a giraffe, from the claims we read on billboards: that Vučić is working to unify Serbs and that Serbia is doing better and better day by day.

Ivan Milenkovic
Student protest

Comment

The people do not want to be robbed and beaten

The pre-election arrests due to the alleged "overthrow of the state" testify to the regime's panic. The bad news for them is - they can't arrest the whole people who decided to defend themselves from progressive beatings and election theft

Nemanja Rujevic
SNS meeting

Comment

Slanderer, tempter and liar: Cross yourself three times   

The ring that tightens around Ćaciland Student list is getting narrower. Because there are more and more spoiled people who see the false prophet for what he is: a street obscener who is fighting Serbia

Andrei Ivanji
See all
Time 1868
Last edition

This situation

Decision Day – everyone goes to the polls subscribe
Elections 2026: From student revolt to decision at the polls

The thorny path to change

Interview: Tihomir Stanić, actor on the Student list

People are eager for justice and normality

Election campaign and related expenses

The ruling party in the state manger

Interview: Ana Graovac, urban planner

Dubai next to Morava, but on septic tanks

See all

Archive

The archive of the weekly Vreme includes all our digital editions, since the very beginning of our work. All issues can be downloaded in PDF format, by purchasing the digital edition, or you can read all available texts from the selected issue.

See all
Time 1868 21.10 2026.
Time 1867 14.10 2026.
Time 1866 07.10 2026.
Time 1865 30.09 2026.
Time 1864 23.09 2026.
Time 1863 16.09 2026.
Time 1862 09.09 2026.
Time 1861 02.09 2026.
Time 1860 26.08 2026.
Time 1859 19.08 2026.
Time 1858 12.08 2026.
Time 1856-1857 29.07 2026.
Time Logo
  • Editorial office
  • Subscription
  • Marketing
  • Terms of use
  • Newsletter
  • Projects
Follow us:

© 2026 Time, Belgrade. Developed by cubes

Mastercard Teacher visa Dina American Express Understanding WSPAY Visa-Secure Mastercard Secure